Geological Survey Permit Program

The Commission has jurisdiction over geological survey activities occurring on sovereign and school state lands. The Commission issues non-exclusive permits to qualified applicants to perform geological surveys on lands within the Commission’s jurisdiction. Operators may conduct surveys using specific types of geological equipment, subject to permit terms and conditions that were developed to minimize impacts to wildlife and the environment.

Project-Specific Geological Survey Permit

This nonexclusive permit authorizes geological survey activity related to a specifically defined survey or surveys. A Project-Specific Geological Survey Permit is required for geological surveys anywhere within the Commission’s jurisdiction. Environmental analysis under the California Environmental Quality Act (CEQA) may be required (i.e., an Environmental Impact Report), which would inform permit terms and conditions specific to the activities being conducted. This permit will be valid for a period appropriate for the project, but not to exceed 3 years.

Required Application Documents

  • Project Description, including project overview, purpose, and timeline.
  • Notification of Geological Survey Equipment Used: a written list of the specific make and model of all such equipment the permittee intends to use to collect data

If the survey is occurring in water:

  • Marine Wildlife Contingency Plan (MWCP)
    The MWCP should identify the marine mammals and reptiles that could be expected within the area being surveyed, including the protected status, minimum population estimate, current population trend, most likely periods of occurrence for each species/stock, identification of pinniped haul-out sites within or immediately adjacent to the proposed survey area, and observation recording procedures and reporting requirements in the event of an observed impact to marine organisms.
  • Oil Spill Contingency Plan
    For accidental releases of petroleum and/or non-petroleum products. Said plans shall include, at a minimum:

Specific steps to be taken in the event of a spill, including notification names, phone numbers, and locations of: (i) nearby emergency medical facilities, (ii) wildlife rescue/response organizations (e.g., Oiled Wildlife Care Network), (iii) containment procedures, and (iv) cleanup procedures.

A description of crew training and equipment testing procedures.

A description, quantities, and location of spill response equipment onboard the vessel.

Active Permits

List of active geological survey permittees

Permit No.PermitteeLocationStart DateEnd Date
9756SubCom, LLCStatewide Offshore2023-08-172026-08-16
9846Natural History Museum of Los Angeles CountyNorth of Anacapa Island, Northwest of San Miguel Island, North of Santa Rosa Island, and within Santa Cruz Passage
(Santa Barbara and Ventura Counties)
2025-10-142026-10-13
9762City of OceansideOffshore City of Oceanside
(San Diego County)
2023-10-292026-10-18
9772Ocean Infinity, IncorporatedStatewide Offshore2023-12-052026-12-04
9939City of LathropSan Joaquin River, Lathrop
(San Joaquin County)
2026-02-092027-02-08
5183City of GridleyFeather River, City of Gridley
(Butte County)
2024-04-042027-04-03
9790LS Power Grid California, LLCSacramento-San Joaquin Delta
(Contra Costa, Sacramento, and Solano Counties)
2024-06-072027-06-06
9799Port of Long BeachOffshore Long Beach and Seal Beach
(Los Angeles and Orange Counties)
2024-08-292027-08-28