Final EIR- September 2012
- Notice of Determination – October 19, 2012
- Notice of Availability – September 18, 2012
- Cover
- Table of Contents
- Part I – Preface
- Part II – Responses to Comments
- Master Responses
- Comment Set A – San Francisco Bay Conservation and Development Commission
- Comment Sets B – F – Other Agencies
- Comment Sets G – K – Organizations and Private Citizens
- Comment Set L – Applicant
- Master Responses
- Part III – Revisions to the Revised Draft EIR
- Executive Summary
- 1.0 – Introduction
- 2.0 – Project Description
- 3.0 – Alternatives and Cumulative Projects
- 4.0 – Environmental Analysis
- 4.1 – Biological Resources
- 4.2 – Mineral Resources
- 4.3 – Hydrology and Water Quality
- 4.4 – Hazards and Hazardous Materials
- 4.5 – Air Quality
- 4.6 – Cultural Resources
- 4.7 – Land Use and Recreation
- 5.0 – Socioeconomic Effects and Environmental Justice
- 6.0 – Other Required CEQA Sections and Environmentally Superior Alternative
- 7.0 – Mitigation Monitoring Program
- 8.0 – Report Preparation Sources
- 9.0 – References
- Appendix A – Distribution List
- Appendix B – Notice of Preparation (NOP) and Comments on the NOP, and Location Where Comments are Addressed in the Draft EIR
- Appendix C – Health Risk Assessment
- Appendix D – Air Emission Calculations
- Appendix E – Entrainment Study
- Appendix F – Benthic Study
- Appendix G – Bathymetric and Hydrodynamic Study
- Appendix H – Detailed Description of Vessel Used in San Mining
- Appendix I – Comments on the July 2010 Draft EIR
Revised Draft EIR – November 2011
- Notice of Availability – Revised November 16, 2011
- Cover
- Table of Contents
- Executive Summary
- 1.0 – Introduction
- 2.0 – Project Description
- 3.0 – Alternatives and Cumulative Projects
- 4.0 – Environmental Analysis – Assessment Methodology
- 4.1 – Biological Resources
- 4.2 – Mineral Resources
- 4.3 – Hydrology and Water Quality
- 4.4 – Hazards and Hazardous Materials
- 4.5 – Air Quality
- 4.6 – Cultural Resources
- 4.7 – Land Use and Recreation
- 5.0 – Socioeconomic Effects and Environmental Justice
- 6.0 – Other Required CEQA Sections and Environmentally Superior Alternative
- 7.0 – Mitigation Monitoring Program
- 8.0 – Report Preparation Sources
- 9.0 – References
- Appendix A – Distribution List
- Appendix B – Notice of Preparation (NOP) and Comments on the NOP, and Location Where Comments are Addressed in the Draft EIR
- Appendix C – Health Risk Assessment
- Appendix D – Air Emission Calculations
- Appendix E – Entrainment Study
- Appendix F – Benthic Study
- Appendix G – Bathymetric and Hydrodynamic Study
- Appendix H – Detailed Description of Vessel Used in Sand Mining
- Appendix I – Comments on the July 2010 Draft EIR
CEQA Documents
Receive Updates
Join this e-list to stay informed about CEQA projects involving the California State Lands Commission.
Abbreviations
APTR = Analysis of Impacts to Public Trust Resources and Values
CEQA = California Environmental Quality Act
EA = Environmental Assessment
EIR = Environmental Impact Report
EIS = Environmental Impact Statement
FONSI = Finding of No Significant Impact
IS = Initial Study
MND = Mitigated Negative Declaration
ND = Negative Declaration
NEPA = National Environmental Policy Act
NOI = Notice of Intent
NOP = Notice of Preparation
Contact
Electronic copies of CEQA documents before 2010 may be requested from:
Nicole Dobroski, Chief
Environmental Science, Planning, and Management Division
916.574.0742
DESPMChief.Public@slc.ca.gov