Welcome to the State of California

Right Column

Carlsbad Desalination Plant - Response

Poseidon response to State Lands Commission letter of February 22, 2008 dated March 3, 2008
Poseidon response to San Diego Regional Quality Control Board letter of February 19, 2008 dated March 7, 2008
Revised Flow, Entrainment and Impingement Minimization Plan dated March 6, 2008
Table of Contents; Executive Summary
  Chapter 1 Introduction
  Chapter 2 Site
  Chapter 3 Design
  Chapter 4 Technology - Part 1
  Chapter 4 Technology - Part 2
  Chapter 5 Quantification of Unavoidable Impacts to Marine Resources.
  Chapter 6 Mitigation
  Chapter 7 Conclusion
  Attachment 1 Cost Estimate of Subsurface Intake Alternatives
  Attachment 2 Impingement results, G1 - Traveling Screen and Bar Rack Weekly Surveys, G2 – Heat Treatment Surveys.
 

Attachment 3

Proposal for Information Collection Clean Water Act Section 316(B), Encina Power Station, Cabrillo Power I LLC, NPDES Permit No. CA0001350, April 1, 2006
  Part 1
  Part 2  
  Part 3  
  Attachment 4 Updated Impingement and Entrainment Assessment, Tenera Environmental , May 2007
  Attachment 5 Carlsbad Desalination Facility – Encina Power Station, Summary of Fish and Target Shellfish Larvae Collected for Entrainment and Source Water Studies in the Vacinity of Agua Hedionda lagoon form June 2005 through May 2006
Transmitted Letter dated January 22, 2007
Response to the State Lands Commission's Letter Dated December 19, 2007
  Attachment 1 Energy Recovery in Caribbean Seawater Reverse Osmosis, R. L. Stover, I. B. Cameron.
  Attachment 2 Basis for Calculation of Carbon Footprint, November 2007
  Attachment 3 Coastal Habitat Restoration and Enhancement Plan for the Carlsbad Desalination Project
  Attachment 4 A 5000 year record of carbon sequestration from a coastal lagoon and wetland complex, Southern California, USA, E. C. Brevik and J.A. Homburg
  Attachment 5 Notes on Carbon Sequestration and Tidal Salt March Restoration, L. Trulio Ph.D., J Callaway Ph.D., Steve Crooks, Ph.D.
  Attachment 6 Scope of Work for Poseidon Resources (Channelside) LLC – CDP #E-06-013 Condition Compliance for “Prior to Issuance” Conditions January 2008
  Attachment 7 Carlsbad Seawater Desalination Project Technical Memorandum – Assessment of Potential Impingement and Entrainment Attributed to Desalination Plant Operations and Associated Area of Production Forgone; May 2007
  Attachment 8 Cabrillo Power I LLC, Encina Power Station 316(b) Cooling Water Intake Effects Entrainment and Impingement Sampling Plan; September 2004
  Attachment 9 Carlsbad Desalination Facility – Summary of Fish and Target Shellfish Larvae Collected for Entrainment and Source Water Studies in the Vicinity of Agua Hedionda Lagoon from June 2005 through May 2006.
  Attachment 10 304 MDG Intake Cost Estimates – October 2007