Mineral Resources Management Division — Belmont Island Decommissioning Project
September - December 2001
|
|
| Removal of rip-rap (boulders) surrounding the entire island structure from the sea floor, being loaded on material barge for depositing at Bolsa Chica artificial reef site. | |
|
Rip-rap removal |
Rip-rap being deposited at Bolsa Chica artificial reef |
November 2001
|
|
Concrete wharf deck was cut into large sections and lifted by derrick barge crane onto the material barge and transported to onshore facility for disposal. |
|
|
East Wharf Removal |
|
|
North Deck Removal |
Loading deck sections on material barge |