Mineral Resources Management Division — Belmont Island Decommissioning Project

September - December 2001
Removal of rip-rap (boulders) surrounding the entire island structure from the sea floor, being loaded on material barge for depositing at Bolsa Chica artificial reef site.

Photo of rip-rap being deposited at Bolsa Chica artificial reef

Photo of rip-rap removal

Rip-rap removal
(click photo to enlarge)

Photo of rip-rap being deposited at Bolsa Chica artificial reef

Rip-rap being deposited at Bolsa Chica artificial reef
(click photo to enlarge)

November 2001
Concrete wharf deck was cut into large sections and lifted by derrick barge crane onto the material barge and transported to onshore facility for disposal.

Photo of East Wharf removal

East Wharf Removal
(click photo to enlarge)

Photo of North Deck Removal

North Deck Removal
(click photo to enlarge)

Photo of Loading deck sections on material barge

Loading deck sections on material barge
(click photo to enlarge)

 