Welcome to the State of California

Right Column

El Paso Line 1903 Pipeline Conversion Project

Final Environmental Impact Report / Environmental Assessment (Finalizing Addendum)

04/08/05

   
  Notice of Intent   Word PDF
  Notice of Availability   Word PDF
  Table of Contents   Word PDF
  1.0 Introduction      
    Part 1 of 2   Word PDF
    Proposed Project Map   Word PDF
    Part 2 of 2   Word PDF
  2.0 Summary of Public Review Process   Word PDF
  3.0 Responses to Comments   Word PDF
    Part 1 of 8   Word PDF
    Part 2 of 8   Word PDF
    Part 3 of 8   Word PDF
    Part 4 of 8   Word PDF
    Part 5 of 8   Word PDF
    Part 6 of 8   Word PDF
    Part 7 of 8   Word PDF
    Part 8 of 8   Word PDF
  4.0 Revised Pages to the Draft EIR/EA   Word PDF
    P.ES-xx Executive Summary   Word PDF
    P.2-4 Project Description   Word PDF
      Section 4.2 Biological Resources:      
    P.4-64 Mitigation for Impact BIO -5d -Pre-construction Sweeps   Word PDF
    P.4-67 MM BIO-6a. Fencing Work Areas   Word PDF
    P.4-88 Ehrenberg to Cadiz Alternative   Word PDF
    P.4-89 Ehrenberg to Cadiz Alternative   Word PDF
      Section 4.5 Hydrology and Water Quality:      
    P.4-140 Surface Water Resources   Word PDF
    P.4-144 Regulatory Setting - State   Word PDF
      Section 4.10 Cultural Resources:      
    P.4-232 Native American Consultation List   Word PDF
    P.4-242 Unanticipated Discovery Plan   Word PDF
    P.4-246 Alternatives - Ehrenberg to Cadiz Alternative   Word PDF
       
Draft Environmental Impact Report/Environmental Assessment 11/23/04    
  Notice of Availability   Word PDF
  Notice of Completion   Word PDF
  Table of Contents   Word PDF
  Executive Summary   Word PDF
    Figure ES-1   JPEG PDF
  1.0 Introduction   Word PDF
    Figure 1.0-1   JPEG PDF
    Figure 1.1-1   JPEG PDF
  2.0 Project Description   Word PDF
    Figure 2.0-1   JPEG PDF
    Figure 2.2-1   JPEG PDF
    Figure 2.2-2   JPEG PDF
    Figure 2.2-3   JPEG PDF
    Figure 2.3-1   JPEG PDF
    Figure 2.4-1   JPEG PDF
  3.0 Alternatives   Word PDF
    Figure 3.2-1   JPEG PDF
    Figure 3.2-2   JPEG PDF
    Figure 3.2-3   JPEG PDF
  4.0 Environmental Analysis      
    4.1 Introduction to Environmental Analysis   Word PDF
    4.2 Biological Resources   Word PDF
      Figure 4.2-1   JPEG PDF
    4.3 Agricultural Resources   Word PDF
    4.4 Geology and Soils   Word PDF
      Figure 4.4-1   JPEG PDF
    4.5 Hydrology and Water Quality   Word PDF
    4.6 Hazards and Public Safety   Word PDF
      Figure 4.6-1, Part 1 of 2   JPEG PDF
      Figure 4.6-1, Part 2 of 2   JPEG PDF
    4.7 Air Quality   Word PDF
    4.8 Traffic and Transportation   Word PDF
    4.9 Noise   Word PDF
    4.10 Cultural Resources   Word PDF
    4.11 Aesthetic/Visual Resources   Word PDF
    4.12 Land Use and Planning   Word PDF
      Figure 4.12-1, Part 1 of 2   JPEG PDF
      Figure 4.12-1, Part 2 of 2   JPEG PDF
      Figure 4.12-2, Part 1 of 2   JPEG PDF
      Figure 4.12-2, Part 2 of 2   JPEG PDF
    4.13 Socioeconomics   Word PDF
    4.14 Recreation   Word PDF
    4.15 Environmental Justice   Word PDF
      Figure 4.15-1   JPEG PDF
      Figure 4.15-2   JPEG PDF
  5.0 Other Required CEQA Sections   Word PDF
      Figure 5.5-1   JPEG PDF
  6.0 Mitigation Monitoring Compliance Reporting Plan   Word PDF
  7.0 Report Preparation Sources   Word PDF
  Appendices      
    A Maps of Project Resources: List of Map Codes   Word PDF
      Index Map   JPEG PDF
      Map 1   JPEG PDF
      Map 2   JPEG PDF
      Map 3   JPEG PDF
      Map 4   JPEG PDF
      Map 5   JPEG PDF
      Map 6   JPEG PDF
      Map 7   JPEG PDF
      Map 8   JPEG PDF
      Map 9   JPEG PDF
      Map 10   JPEG PDF
      Map 11   JPEG PDF
      Map 12   JPEG PDF
      Map 13   JPEG PDF
      Map 14   JPEG PDF
      Map 15   JPEG PDF
      Map 16   JPEG PDF
    B Comments to Notice of Preparation      
      Part 1 of 4     PDF
      Part 2 of 4     PDF
      Part 3 of 4     PDF
      Part 4 of 4     PDF
    C Distribution List   Word PDF
    D EPNG-Prepared Compliance Plans      
    D1 Upland Erosion, Control, Revegetation, and Maintenance Plan (UCERM Plan)   Word PDF
    D2 Line 1903 Wetland and Waterbody Construction and Mitigation Procedures   Word PDF
    D3 Storm Water Pollution Prevention Plan (SWPPP)   Word PDF
    D4 Spill Prevention, Containment, and Countermeasure Plan (SPCC Plan)   Word PDF
    D5 Noxious Weeds Protection Plan   Word PDF
    D6 Fire Prevention and Suppression Plan   Word PDF
    D7 Desert Tortoise Handling Plan   Word PDF
    D8 Protection Measures for Special Status Species During Construction   Word PDF
    D9 Contaminated Soils Plan   Word PDF
    E Special Status Species Information   Word PDF
    F Air Emissions Calculations     PDF
       

Notice of Intent/Preparation to Prepare a Joint Environmental Impact Report/Environmental Assessment (EIR/EA) for the Proposed El Paso Line No.1903 Pipeline Conversion Project; Request For Comments on Environmental Issues and Notice of Public Scoping Meetings

10/15/02

Word PDF