Central Coastal California Seismic Imaging Project
*Note: In the interest of maintaining the quality of document images while ensuring accessibility for slower internet connections, some sections of the document are broken up into several parts. All documents are provided in Adobe Acrobat format only.
Final Environmental Impact Report
Volume 1 - Preface and Responses to Comments
- Cover Sheet
- Section I - Preface to the Final Environmental Impact Report
- Section II - Responses to Comments: Introduction and Master Responses
Volume 2 - Revisions to Draft Environmental Impact Report
- Cover Sheet
- Section III - Revisions to Draft Environmental Impact Report
- Executive Summary
- Table of Contents
- 1.0 Introduction
- 2.0 Project Description
- 3.0 Cumulative Setting
- 4.0 Existing Environment and Environmental Impact Analysis
- 4.1 Aesthetics
- 4.2 Air Quality
- 4.3 Biological Resources - Terrestrial
- 4.4 Biological Resources - Marine
- 4.5 Cultural Resources
- 4.6 Geology and Soils
- 4.7 Greenhouse Gases
- 4.8 Public Safety
- 4.9 Sediment and Water Quality
- 4.10 Land Use and Recreation
- 4.11 Noise
- 4.12 Traffic and Transportation
- 4.13 Commercial Fishing
- 5.0 Alternatives
- 6.0 Other Required CEQA Sections
- 7.0 Socioeconomic Effects and Environmental Justice
- 8.0 Mitigation Monitoring Program
- 9.0 Report Preparation Sources
- 10.0 References
- Appendix A - Final EIR Distribution List
- Appendix B - Notice of Preparation (NOP), Scoping Meeting Transcripts and Sign-in Sheets, and Comments on NOP
- Appendix C - Survey Equipment Specifications
- Appendix D - Marine Wildlife Contingency Plan
- Appendix E - Terrestrial Biology Survey Report
- Appendix F - Avian Protection Plan
- Appendix G - Emissions Estimate Calculations
- Appendix H - Marine Mammal Technical Report (SMRU)
- Appendix I - Underwater Noise Assessment Technical Report (JASCO)
- Appendix J - Shoreline Fault Zone Report
- Appendix K - PG&E's Larval Mortality Modeling Report and Proposed Long-Term Fish Monitoring Program
- Appendix L - ROV Surveys of Nearshore Geophone Routes
- Appendix M - Draft EIR Public Comment Period Documentation

