Para leer el documento en Español apriete aquí. |
|
|
|
Final Environmental Impact Report |
March 2007 |
|
|
| |
Final EIR/Volume I |
|
|
|
| |
Abstract |
|
PDF |
|
| |
Signature Page |
|
PDF |
|
| |
Inside Cover - FinalEIR/FinalEIR/Volume I |
|
PDF |
|
| |
Table of Contents |
|
PDF |
|
| |
Executive Summary |
|
PDF |
|
| |
1.0 |
Introduction |
|
PDF |
|
| |
2.0 |
Description of the Proposed Action |
|
PDF |
|
| |
3.0 |
Alternatives |
|
PDF |
|
| |
4.0 |
Environmental Analysis |
|
|
|
| |
|
4.1 |
Introduction to Environmental Analysis |
|
PDF |
|
| |
|
4.2 |
Public Safety: Hazards and Risk Analysis |
|
PDF |
|
| |
|
4.3 |
Marine Traffic |
|
PDF |
|
| |
|
4.4 |
Aesthetics |
|
PDF |
|
| |
|
4.5 |
Agriculture and Soils |
|
PDF |
|
| |
|
4.6 |
Air Quality |
|
PDF |
|
| |
|
|
|
|
|
| |
Final EIR/Volume II |
|
|
|
| |
Inside Cover - FinalEIR/Volume II |
|
PDF |
|
| |
Table of Contents (NOTE: same as Volume 1) |
|
PDF |
|
| |
4.0 |
Environmental Analysis (continued) |
|
|
|
| |
|
4.7 |
Biological Resources - Marine |
|
PDF |
|
| |
|
4.8 |
Biological Resources – Terrestrial |
|
|
|
| |
|
|
Part 1 |
|
PDF |
|
| |
|
|
Part 2 |
|
PDF |
|
| |
|
|
Part 3 |
|
PDF |
|
| |
|
|
Part 4 |
|
PDF |
|
| |
|
4.9 |
Cultural Resources |
|
PDF |
|
| |
|
4.10 |
Energy and Minerals |
|
PDF |
|
| |
|
4.11 |
Geologic Resources and Hazards |
|
PDF |
|
| |
|
4.12 |
Hazardous Materials |
|
PDF |
|
| |
|
4.13 |
Land Use |
|
PDF |
|
| |
|
4.14 |
Noise and Vibration |
|
PDF |
|
| |
|
4.15 |
Recreation |
|
PDF |
|
| |
|
4.16 |
Socioeconomics |
|
PDF |
|
| |
|
4.17 |
Transportation |
|
PDF |
|
| |
|
4.18 |
Water Quality and Sediments |
|
PDF |
|
| |
|
4.19 |
Environmental Justice |
|
PDF |
|
| |
|
4.20 |
Cumulative Impacts Analysis |
|
PDF |
|
| |
|
5.0 |
Other Required NEPA/CEQA Considerations |
|
PDF |
|
| |
|
6.0 |
Conclusions and Recommendations |
|
PDF |
|
| |
|
7.0 |
Report Preparation |
|
PDF |
|
| |
|
|
|
|
|
|
| |
Final EIR/Volume III |
|
|
|
| |
Title Page – FinalEIR/Volume III |
|
PDF |
|
| |
List of Appendices |
|
PDF |
|
| |
Appendix A - Distribution List |
|
PDF |
|
| |
Appendix B -Public Notices |
|
PDF |
|
| |
Appendix C1 - Independent Risk Assessment of The Proposed Cabrillo Port Liquified Natural Gas Deepwater Port Project |
|
|
|
| |
|
C1 – Report |
|
PDF |
|
| |
|
C1 – Appendix A |
|
PDF |
|
| |
|
C1 – Appendix B |
|
PDF |
|
| |
|
C1 – Appendix C |
|
PDF |
|
| |
|
C1 – Appendix D |
|
PDF |
|
| |
|
C1 – Appendix E |
|
PDF |
|
| |
|
C1 – Appendix F |
|
PDF |
|
| |
Appendix C2 - Review of the Independent Risk Assessment of the Proposed Cabrillo Port Liquified Natural Gas Deepwater Port Project |
|
PDF |
|
| |
Appendix C3 – 1. Chronological List of Lng Accidents, 2. Marine Safety and Security Requirements, 3. Design and Safety Standards Applicable to Natural Gas Projects |
|
PDF |
|
| |
Appendix D1 - Drilling Fluid Release Monitoring Plan – Horizontal Directional Boring |
|
PDF |
|
| |
Appendix D2 - Anchor Mitigation Plan for Horizontal Directionally Bored Nearshore Pipeline Project Marine Operations |
|
PDF |
|
| |
Appendix D3 - Horizontal Directionally Bored Nearshore Pipeline Project Marine Operations |
|
PDF |
|
| |
Appendix D4 - Preliminary Construction Procedure and Design for Horizontally Directionally Bored Pipeline Landfall |
|
PDF |
|
| |
Appendix D5 - Sea Water System Operations and Design Features |
|
PDF |
|
| |
Appendix D6 - Seawater Cooling Elimination |
|
PDF |
|
| |
Appendix E - California Coastal Commission LNG Siting Studies (Excerpts) |
|
|
|
| |
|
E – Final Report Evaluating and Ranking LNG Terminal Sites |
|
PDF |
|
| |
|
E – Offshore LNG Terminal Study |
|
PDF |
|
| |
Appendix F - Distance Calculations for Aesthetics Analysis |
|
PDF |
|
| |
Appendix G1 - Air Quality – Construction Emissions |
|
PDF |
|
| |
Appendix G2 - Air Quality – Operating Emissions |
|
PDF |
|
| |
Appendix G3 - Air Quality – FSRU Startup Emissions |
|
PDF |
|
| |
Appendix G4 – Comments and Responses |
|
|
|
| |
|
G4 – General Conformity Analysis |
|
PDF |
|
| |
|
G4 – Comments and Responses |
|
PDF |
|
| |
Appendix G5 - Air Quality – Air Quality Analysis of Construction Emissions - Criteria Air Pollutants |
|
PDF |
|
| |
Appendix G6 - Air Quality – Health Risk Analyses of Construction and Operating Emissions - Toxic Air Contaminants |
|
PDF |
|
| |
Appendix G7 - Air Quality - Air Quality Analyses of Operating and FSRU Startup Emissions - Criteria Air Pollutants |
|
PDF |
|
| |
Appendix G8 - Air Quality - Air Quality Analysis of Operating Emissions - Ammonia |
|
PDF |
|
| |
Appendix G9 - Air Quality - CARB Comments on the BHP Billiton Emissions Reduction Proposal |
|
PDF |
|
| |
Appendix H1 - Cabrillo Port Ichthyoplankton Impact Analysis |
|
PDF |
|
| |
Appendix H2 - Noise Analysis of Onshore and Offshore Construction Phase |
|
PDF |
|
| |
Appendic H3 - Acoustic Study |
|
PDF |
|
| |
Appendix I - Section 7 Threatened and Endangered Species and EFH Agency Consultation |
|
|
|
| |
|
I – Part 1 |
|
PDF |
|
| |
|
I – Part 2 |
|
PDF |
|
| |
|
I – Part 3 |
|
PDF |
|
| |
|
I – Part 4 |
|
PDF |
|
| |
|
I – Part 5 |
|
PDF |
|
| |
|
I – Part 6 |
|
PDF |
|
| |
Appendix J1 - USGS Comments on Potential Geologic and Seismic Hazards Affecting Coastal Ventura County |
|
PDF |
|
| |
Appendix J2 - Preliminary Seismic and Geologic Hazards Evaluation |
|
|
|
| |
|
J2 – Part 1 |
|
PDF |
|
| |
|
J2 – Part 2 |
|
PDF |
|
| |
|
J2 – Part 3 |
|
PDF |
|
| |
|
J2 – Map |
|
PDF |
|
| |
|
J2 – Plates Part 1 |
|
PDF |
|
| |
|
J2 – Plates Part 2 |
|
PDF |
|
| |
|
J2 – Plates Part 3 |
|
PDF |
|
| |
Appendix J3 - Geologic and Geotechnical Evaluation of Proposed Center Road and Line 225 Loop Pipeline Routes |
|
|
|
| |
|
J3 – Evaluation |
|
PDF |
|
| |
|
J3 – Figure 1 |
|
PDF |
|
| |
|
J3 – Figure 2 |
|
PDF |
|
| |
|
J3 – Figure 3 |
|
PDF |
|
| |
|
J3 – Figure 4 |
|
PDF |
|
| |
|
J3 – Figure 5 |
|
PDF |
|
| |
|
J3 – Figure 6 |
|
PDF |
|
| |
|
J3 – Figure 7 |
|
PDF |
|
| |
|
J3 – Figure 8 |
|
PDF |
|
| |
|
J3 – Figure 9 |
|
PDF |
|
| |
|
J3 – Figure 10 |
|
PDF |
|
| |
|
J3 – Figure 11 |
|
PDF |
|
| |
|
J3 – Figure 12 |
|
PDF |
|
| |
|
J3 – Figure 13 |
|
PDF |
|
| |
|
J3 – Figure 14 |
|
PDF |
|
| |
|
J3 – Figure 15 |
|
PDF |
|
| |
|
J3 – Figure 16 |
|
PDF |
|
| |
|
J3 – Figure 17 |
|
PDF |
|
| |
|
J3 – Figure 18 |
|
PDF |
|
| |
|
J3 – Figure 19 |
|
PDF |
|
| |
|
J3 – Figure 20 |
|
PDF |
|
| |
|
J3 – Figure 21 |
|
PDF |
|
| |
|
J3 – Figure 22 |
|
PDF |
|
| |
Appendix J4 - Geotechnical Desktop Study |
|
|
|
| |
|
J4 – Desktop Study |
|
PDF |
|
| |
|
J4 – Plate 1 |
|
PDF |
|
| |
|
J4 – Plate 2 |
|
PDF |
|
| |
|
J4 – Plate 3 |
|
PDF |
|
| |
|
J4 – Plate 4a |
|
PDF |
|
| |
|
J4 – Plate 4b |
|
PDF |
|
| |
|
J4 – Plate 6 |
|
PDF |
|
| |
|
J4 – Plate 6 |
|
PDF |
|
| |
|
J4 – Plate 7 |
|
PDF |
|
| |
|
J4 – Plate 8 |
|
PDF |
|
| |
|
J4 – Plate 9 |
|
PDF |
|
| |
|
J4 – Plate 10 |
|
PDF |
|
| |
|
J4 – Plate 11 |
|
PDF |
|
| |
|
J4 – Appendix A |
|
PDF |
|
| |
Appendix K1 - Summary of Environmental Data Resources, Inc., Datamap Corridor Studies 2003–2005 |
|
PDF |
|
| |
Appendix K2 - Environmental Data Resources, Inc., Reports and Maps, December 2006 |
|
|
|
| |
|
K2 – Title Page |
|
PDF |
|
| |
|
K2 – Arnold Road Pipeline Map |
|
PDF |
|
| |
|
K2 – Arnold Road Pipeline Report |
|
PDF |
|
| |
|
K2 – Center Road Pipeline Alternate 1 Map |
|
PDF |
|
| |
|
K2 – Center Road Pipeline Alternate 1 Report Part 1 |
|
PDF |
|
| |
|
K2 – Center Road Pipeline Alternate 1 Report Part 2 |
|
PDF |
|
| |
|
K2 – Center Road Pipeline Alternate 2 Map |
|
PDF |
|
| |
|
K2 – Center Road Pipeline Alternate 2 Report Part 1 |
|
PDF |
|
| |
|
K2 – Center Road Pipeline Alternate 2 Report Part 2 |
|
PDF |
|
| |
|
K2 – Center Road Pipeline Alternate 3 Map |
|
PDF |
|
| |
|
K2 – Center Road Pipeline Alternate 3 Report |
|
PDF |
|
| |
|
K2 – Line 225 Pipeline Alternate Map |
|
PDF |
|
| |
|
K2 – Line 225 Pipeline Alternate Report Part 1 |
|
PDF |
|
| |
|
K2 – Line 225 Pipeline Alternate Report Part 2 |
|
PDF |
|
| |
|
K2 – Proposed Center Road Pipeline Map |
|
PDF |
|
| |
|
K2 – Proposed Center Road Pipeline Report Part 1 |
|
PDF |
|
| |
|
K2 – Proposed Center Road Pipeline Report Part 2 |
|
PDF |
|
| |
|
K2 – Proposed Line 225 Pipeline Map |
|
PDF |
|
| |
|
K2 – Proposed Line 225 Pipeline Report Part 1 |
|
PDF |
|
| |
|
K2 – Proposed Line 225 Pipeline Report Part 2 |
|
PDF |
|
| |
|
K2 – Proposed Line 225 Pipeline Report Part 3 |
|
PDF |
|
| |
|
K2 – Point Mugu Map |
|
PDF |
|
| |
|
K2 – Point Mugu Report |
|
PDF |
|
| |
|
K2 – Reliant Energy Mandalay Map |
|
PDF |
|
| |
|
K2 – Reliant Energy Mandalay Report Part 1 |
|
PDF |
|
| |
|
K2 – Reliant Energy Mandalay Report Part 2 |
|
PDF |
|
| |
Appendix L - Letter from the Hon. Ian Macfarlane MP Minister for Industry, Tourism and Resources, Australia |
|
PDF |
|
| |
Appendix M - Water Quality Construction Best Management Practices Man |
|
PDF |
|
| |
|
|
|
|
|
| |
Final EIR/Volume IV |
|
|
|
| |
Index |
|
|
|
PDF |
|
| |
2004 Public Hearing Transcripts |
|
|
|
| |
|
Public Hearing - 11/29/04 Santa Clarita, CA |
|
|
|
| |
|
|
Part 1 |
|
PDF |
|
| |
|
|
Part 2 |
|
PDF |
|
| |
|
|
Part 3 |
|
PDF |
|
| |
|
Public Hearing - 11/30/04 Oxnard, CA Afternoon |
|
|
|
| |
|
|
Part 1 |
|
PDF |
|
| |
|
|
Part 2 |
|
PDF |
|
| |
|
|
Part 3 |
|
PDF |
|
| |
|
Public Hearing - 11/30/04 Oxnard, CA Evening |
|
|
|
| |
|
|
Part 1 |
|
PDF |
|
| |
|
|
Part 2 |
|
PDF |
|
| |
|
|
Part 3 |
|
PDF |
|
| |
|
|
Part 4 |
|
PDF |
|
| |
|
|
Part 5 |
|
PDF |
|
| |
|
|
Part 6 |
|
PDF |
|
| |
|
|
Part 7 |
|
PDF |
|
| |
|
Public Hearing - 12/1/04 Malibu, CA |
|
|
|
| |
|
|
Part 1 |
|
PDF |
|
| |
|
|
Part 2 |
|
PDF |
|
| |
|
|
Part 3 |
|
PDF |
|
| |
|
|
Part 4 |
|
PDF |
|
| |
|
Public Hearing Transcripts Errata |
|
PDF |
|
| |
|
2004 Letters – Federal Government |
|
|
|
| |
|
|
Elected Officials |
|
PDF |
|
| |
|
|
Agencies |
|
|
|
| |
|
|
Part 1 |
|
PDF |
|
| |
|
|
Part 2 |
|
PDF |
|
| |
|
2004 Letters – State Government |
|
|
|
| |
|
Elected Officials |
|
PDF |
|
| |
|
|
Agencies |
|
|
|
| |
|
|
Part 1 |
|
PDF |
|
| |
|
|
Part 2 |
|
|
PDF |
|
| |
|
|
Part 3 |
|
|
PDF |
|
| |
|
|
Part 4 |
|
|
PDF |
|
| |
|
2004 Letters – Local Government |
|
|
|
| |
|
Elected Officials |
|
PDF |
|
| |
|
|
Agencies |
|
|
|
| |
|
|
Part 1 |
|
|
PDF |
|
| |
|
|
Part 2 |
|
|
PDF |
|
| |
|
|
Part 3 |
|
|
PDF |
|
| |
|
|
Part 4 |
|
|
PDF |
|
| |
|
|
Part 5 |
|
|
PDF |
|
| |
|
|
Part 6 |
|
|
PDF |
|
| |
|
2004 Letters – General Public |
|
|
|
| |
|
|
Part 1 (A) |
|
PDF |
|
| |
|
|
Part 2 (B part 1) |
|
PDF |
|
| |
|
|
Part 3 (B part 2) |
|
PDF |
|
| |
|
|
Part 4 (C) |
|
PDF |
|
| |
|
|
Part 5 (D) |
|
PDF |
|
| |
|
|
Part 6 (E) |
|
PDF |
|
| |
|
|
Part 7 (F) |
|
PDF |
|
| |
|
|
Part 8 (G) |
|
PDF |
|
| |
|
|
Part 9 (H part 1) |
|
PDF |
|
| |
|
|
Part 10 (H part 2) |
|
PDF |
|
| |
|
|
Part 11 (Hill part 1) |
|
PDF |
|
| |
|
|
Part 12 (Hill part 2) |
|
PDF |
|
| |
|
|
Part 13 (Hill part 3) |
|
PDF |
|
| |
|
|
Part 14 (Hill part 4) |
|
PDF |
|
| |
|
|
Part 15 (Hill part 5) |
|
PDF |
|
| |
|
|
Part 16 (Horowitz part 1) |
|
PDF |
|
| |
|
|
Part 17 (Horowitz part 2) |
|
PDF |
|
| |
|
|
Part 18 (Horowitz part 3) |
|
PDF |
|
| |
|
|
Part 19 (Horowitz part 4) |
|
PDF |
|
| |
|
|
Part 20 (Horowitz part 1) |
|
PDF |
|
| |
|
|
Part 21 (Horowitz part 6) |
|
PDF |
|
| |
|
|
Part 22 (I) |
|
PDF |
|
| |
|
|
Part 23 (J) |
|
PDF |
|
| |
|
|
Part 24 (K part 1) |
|
PDF |
|
| |
|
|
Part 25 (Krop part 1) |
|
PDF |
|
| |
|
|
Part 26 (Krop part 2) |
|
PDF |
|
| |
|
|
Part 27 (Krop part 3) |
|
PDF |
|
| |
|
|
Part 28 (Krop part 4) |
|
PDF |
|
| |
|
|
Part 29 (Krop part 5) |
|
PDF |
|
| |
|
|
Part 30 (Krop part 6) |
|
PDF |
|
| |
|
|
Part 31 (Krop part 7) |
|
PDF |
|
| |
|
|
Part 32 (Krop part 8) |
|
PDF |
|
| |
|
|
Part 33 (Krop part 9) |
|
PDF |
|
| |
|
|
Part 34 (Krop part 10) |
|
PDF |
|
| |
|
|
Part 35 (Krop part 11) |
|
PDF |
|
| |
|
|
Part 36 (Krop part 12) |
|
PDF |
|
| |
|
|
Part 37 (Krop part 13) |
|
PDF |
|
| |
|
|
Part 38 (Krop part 14) |
|
PDF |
|
| |
|
|
Part 39 (Krop part 15) |
|
PDF |
|
| |
|
|
Part 40 (Krop part 16) |
|
PDF |
|
| |
|
|
Part 41 (L) |
|
PDF |
|
| |
|
|
Part 42 (M part 1) |
|
PDF |
|
| |
|
|
Part 43 (M part 2) |
|
PDF |
|
| |
|
|
Part 44 (McLaughlin) |
|
PDF |
|
| |
|
|
Part 45 (N) |
|
PDF |
|
| |
|
|
Part 46 (O) |
|
PDF |
|
| |
|
|
Part 47 (P part 1) |
|
PDF |
|
| |
|
|
Part 48 (P part 2) |
|
PDF |
|
| |
|
|
Part 49 (Powers part 1) |
|
PDF |
|
| |
|
|
Part 50 (Powers part 2) |
|
PDF |
|
| |
|
|
Part 51 (Q) |
|
PDF |
|
| |
|
|
Part 52 (R) |
|
PDF |
|
| |
|
|
Part 53 (S part 1) |
|
PDF |
|
| |
|
|
Part 54 (S part 2) |
|
PDF |
|
| |
|
|
Part 55 (S part 3) |
|
PDF |
|
| |
|
|
Part 56 (T) |
|
PDF |
|
| |
|
|
Part 57 (Terry part 1) |
|
PDF |
|
| |
|
|
Part 58 (Terry part 2) |
|
PDF |
|
| |
|
|
Part 59 (Terry part 3) |
|
PDF |
|
| |
|
|
Part 60 (Terry part 4) |
|
PDF |
|
| |
|
|
Part 61 (Terry part 5) |
|
PDF |
|
| |
|
|
Part 62 (Terry part 6) |
|
PDF |
|
| |
|
|
Part 63 (Terry part 7) |
|
PDF |
|
| |
|
|
Part 64 (Terry part 8) |
|
PDF |
|
| |
|
|
Part 65 (Terry part 9) |
|
PDF |
|
| |
|
|
Part 66 (Terry part 10) |
|
PDF |
|
| |
|
|
Part 67 (Terry part 11) |
|
PDF |
|
| |
|
|
Part 68 (Terry part 12) |
|
PDF |
|
| |
|
|
Part 69 (Terry part 13) |
|
|