BHP Billiton Cabrillo Port Liquefied Natural Gas Deepwater Port

Para leer el documento en Español apriete aquí.  

Final Environmental Impact Report

March 2007

 

Final EIR/Volume I

 
  Abstract  
  Signature Page  
  Inside Cover - FinalEIR/FinalEIR/Volume I  
  Table of Contents  
  Executive Summary  
  1.0 Introduction  
  2.0 Description of the Proposed Action  
  3.0 Alternatives  
  4.0 Environmental Analysis  
    4.1 Introduction to Environmental Analysis  
    4.2 Public Safety: Hazards and Risk Analysis  
    4.3 Marine Traffic  
    4.4 Aesthetics  
    4.5 Agriculture and Soils  
    4.6 Air Quality  
 

Final EIR/Volume II

 
  Inside Cover - FinalEIR/Volume II  
  Table of Contents (NOTE: same as Volume 1)  
  4.0 Environmental Analysis (continued)  
    4.7 Biological Resources - Marine  
    4.8 Biological Resources – Terrestrial  
      Part 1  
      Part 2  
      Part 3  
      Part 4  
    4.9 Cultural Resources  
    4.10 Energy and Minerals  
    4.11 Geologic Resources and Hazards  
    4.12 Hazardous Materials  
    4.13 Land Use  
    4.14 Noise and Vibration  
    4.15 Recreation  
    4.16 Socioeconomics  
    4.17 Transportation  
    4.18 Water Quality and Sediments  
    4.19 Environmental Justice  
    4.20 Cumulative Impacts Analysis  
    5.0 Other Required NEPA/CEQA Considerations  
    6.0 Conclusions and Recommendations  
    7.0 Report Preparation  
 

Final EIR/Volume III

 
  Title Page – FinalEIR/Volume III  
  List of Appendices  
  Appendix A - Distribution List  
  Appendix B -Public Notices  
  Appendix C1 - Independent Risk Assessment of The Proposed Cabrillo Port Liquified Natural Gas Deepwater Port Project  
    C1 – Report  
    C1 – Appendix A  
    C1 – Appendix B  
    C1 – Appendix C  
    C1 – Appendix D  
    C1 – Appendix E  
    C1 – Appendix F  
  Appendix C2 - Review of the Independent Risk Assessment of the Proposed Cabrillo Port Liquified Natural Gas Deepwater Port Project  
  Appendix C3 – 1. Chronological List of Lng Accidents, 2. Marine Safety and Security Requirements, 3. Design and Safety Standards Applicable to Natural Gas Projects  
  Appendix D1 - Drilling Fluid Release Monitoring Plan – Horizontal Directional Boring  
  Appendix D2 - Anchor Mitigation Plan for Horizontal Directionally Bored Nearshore Pipeline Project Marine Operations  
  Appendix D3 - Horizontal Directionally Bored Nearshore Pipeline Project Marine Operations  
  Appendix D4 - Preliminary Construction Procedure and Design for Horizontally Directionally Bored Pipeline Landfall  
  Appendix D5 - Sea Water System Operations and Design Features  
  Appendix D6 - Seawater Cooling Elimination  
  Appendix E - California Coastal Commission LNG Siting Studies (Excerpts)  
    E – Final Report Evaluating and Ranking LNG Terminal Sites  
    E – Offshore LNG Terminal Study  
  Appendix F - Distance Calculations for Aesthetics Analysis  
  Appendix G1 - Air Quality – Construction Emissions  
  Appendix G2 - Air Quality – Operating Emissions  
  Appendix G3 - Air Quality – FSRU Startup Emissions  
  Appendix G4 – Comments and Responses  
    G4 – General Conformity Analysis  
    G4 – Comments and Responses  
  Appendix G5 - Air Quality – Air Quality Analysis of Construction Emissions - Criteria Air Pollutants  
  Appendix G6 - Air Quality – Health Risk Analyses of Construction and Operating Emissions - Toxic Air Contaminants  
  Appendix G7 - Air Quality - Air Quality Analyses of Operating and FSRU Startup Emissions - Criteria Air Pollutants  
  Appendix G8 - Air Quality - Air Quality Analysis of Operating Emissions - Ammonia  
  Appendix G9 - Air Quality - CARB Comments on the BHP Billiton Emissions Reduction Proposal  
  Appendix H1 - Cabrillo Port Ichthyoplankton Impact Analysis  
  Appendix H2 - Noise Analysis of Onshore and Offshore Construction Phase  
  Appendic H3 - Acoustic Study  
  Appendix I - Section 7 Threatened and Endangered Species and EFH Agency Consultation  
    I – Part 1  
    I – Part 2  
    I – Part 3  
    I – Part 4  
    I – Part 5  
    I – Part 6  
  Appendix J1 - USGS Comments on Potential Geologic and Seismic Hazards Affecting Coastal Ventura County  
  Appendix J2 - Preliminary Seismic and Geologic Hazards Evaluation  
    J2 – Part 1  
    J2 – Part 2  
    J2 – Part 3  
    J2 – Map  
    J2 – Plates Part 1  
    J2 – Plates Part 2  
    J2 – Plates Part 3  
  Appendix J3 - Geologic and Geotechnical Evaluation of Proposed Center Road and Line 225 Loop Pipeline Routes  
    J3 – Evaluation  
    J3 – Figure 1  
    J3 – Figure 2  
    J3 – Figure 3  
    J3 – Figure 4  
    J3 – Figure 5  
    J3 – Figure 6  
    J3 – Figure 7  
    J3 – Figure 8  
    J3 – Figure 9  
    J3 – Figure 10  
    J3 – Figure 11  
    J3 – Figure 12  
    J3 – Figure 13  
    J3 – Figure 14  
    J3 – Figure 15  
    J3 – Figure 16  
    J3 – Figure 17  
    J3 – Figure 18  
    J3 – Figure 19  
    J3 – Figure 20  
    J3 – Figure 21  
    J3 – Figure 22  
  Appendix J4 - Geotechnical Desktop Study  
    J4 – Desktop Study  
    J4 – Plate 1  
    J4 – Plate 2  
    J4 – Plate 3  
    J4 – Plate 4a  
    J4 – Plate 4b  
    J4 – Plate 6  
    J4 – Plate 6  
    J4 – Plate 7  
    J4 – Plate 8  
    J4 – Plate 9  
    J4 – Plate 10  
    J4 – Plate 11  
    J4 – Appendix A  
  Appendix K1 - Summary of Environmental Data Resources, Inc., Datamap Corridor Studies 2003–2005  
  Appendix K2 - Environmental Data Resources, Inc., Reports and Maps, December 2006  
    K2 – Title Page  
    K2 – Arnold Road Pipeline Map  
    K2 – Arnold Road Pipeline Report  
    K2 – Center Road Pipeline Alternate 1 Map  
    K2 – Center Road Pipeline Alternate 1 Report Part 1  
    K2 – Center Road Pipeline Alternate 1 Report Part 2  
    K2 – Center Road Pipeline Alternate 2 Map  
    K2 – Center Road Pipeline Alternate 2 Report Part 1  
    K2 – Center Road Pipeline Alternate 2 Report Part 2  
    K2 – Center Road Pipeline Alternate 3 Map  
    K2 – Center Road Pipeline Alternate 3 Report  
    K2 – Line 225 Pipeline Alternate Map  
    K2 – Line 225 Pipeline Alternate Report Part 1  
    K2 – Line 225 Pipeline Alternate Report Part 2  
    K2 – Proposed Center Road Pipeline Map  
    K2 – Proposed Center Road Pipeline Report Part 1  
    K2 – Proposed Center Road Pipeline Report Part 2  
    K2 – Proposed Line 225 Pipeline Map  
    K2 – Proposed Line 225 Pipeline Report Part 1  
    K2 – Proposed Line 225 Pipeline Report Part 2  
    K2 – Proposed Line 225 Pipeline Report Part 3  
    K2 – Point Mugu Map  
    K2 – Point Mugu Report  
    K2 – Reliant Energy Mandalay Map  
    K2 – Reliant Energy Mandalay Report Part 1  
    K2 – Reliant Energy Mandalay Report Part 2  
  Appendix L - Letter from the Hon. Ian Macfarlane MP Minister for Industry, Tourism and Resources, Australia  
  Appendix M - Water Quality Construction Best Management Practices Man  
 

Final EIR/Volume IV

 
  Index      
  2004 Public Hearing Transcripts  
    Public Hearing - 11/29/04 Santa Clarita, CA  
      Part 1  
      Part 2  
      Part 3  
    Public Hearing - 11/30/04 Oxnard, CA Afternoon  
      Part 1  
      Part 2  
      Part 3  
    Public Hearing - 11/30/04 Oxnard, CA Evening  
      Part 1  
      Part 2  
      Part 3  
      Part 4  
      Part 5  
      Part 6  
      Part 7  
    Public Hearing - 12/1/04 Malibu, CA  
      Part 1  
      Part 2  
      Part 3  
      Part 4  
    Public Hearing Transcripts Errata  
    2004 Letters – Federal Government  
      Elected Officials  
      Agencies  
      Part 1  
      Part 2  
    2004 Letters – State Government  
    Elected Officials  
      Agencies  
      Part 1  
      Part 2    
      Part 3    
      Part 4    
    2004 Letters – Local Government  
    Elected Officials  
      Agencies  
      Part 1    
      Part 2    
      Part 3    
      Part 4    
      Part 5    
      Part 6    
    2004 Letters – General Public  
      Part 1 (A)  
      Part 2 (B part 1)  
      Part 3 (B part 2)  
      Part 4 (C)  
      Part 5 (D)  
      Part 6 (E)  
      Part 7 (F)  
      Part 8 (G)  
      Part 9 (H part 1)  
      Part 10 (H part 2)  
      Part 11 (Hill part 1)  
      Part 12 (Hill part 2)  
      Part 13 (Hill part 3)  
      Part 14 (Hill part 4)  
      Part 15 (Hill part 5)  
      Part 16 (Horowitz part 1)  
      Part 17 (Horowitz part 2)  
      Part 18 (Horowitz part 3)  
      Part 19 (Horowitz part 4)  
      Part 20 (Horowitz part 1)  
      Part 21 (Horowitz part 6)  
      Part 22 (I)  
      Part 23 (J)  
      Part 24 (K part 1)  
      Part 25 (Krop part 1)  
      Part 26 (Krop part 2)  
      Part 27 (Krop part 3)  
      Part 28 (Krop part 4)  
      Part 29 (Krop part 5)  
      Part 30 (Krop part 6)  
      Part 31 (Krop part 7)  
      Part 32 (Krop part 8)  
      Part 33 (Krop part 9)  
      Part 34 (Krop part 10)  
      Part 35 (Krop part 11)  
      Part 36 (Krop part 12)  
      Part 37 (Krop part 13)  
      Part 38 (Krop part 14)  
      Part 39 (Krop part 15)  
      Part 40 (Krop part 16)  
      Part 41 (L)  
      Part 42 (M part 1)  
      Part 43 (M part 2)  
      Part 44 (McLaughlin)  
      Part 45 (N)  
      Part 46 (O)  
      Part 47 (P part 1)  
      Part 48 (P part 2)  
      Part 49 (Powers part 1)  
      Part 50 (Powers part 2)  
      Part 51 (Q)  
      Part 52 (R)  
      Part 53 (S part 1)  
      Part 54 (S part 2)  
      Part 55 (S part 3)  
      Part 56 (T)  
      Part 57 (Terry part 1)  
      Part 58 (Terry part 2)  
      Part 59 (Terry part 3)  
      Part 60 (Terry part 4)  
      Part 61 (Terry part 5)  
      Part 62 (Terry part 6)  
      Part 63 (Terry part 7)  
      Part 64 (Terry part 8)  
      Part 65 (Terry part 9)  
      Part 66 (Terry part 10)  
      Part 67 (Terry part 11)  
      Part 68 (Terry part 12)  
      Part 69 (Terry part 13)  
      Part 70 (U-V)  
      Part 71 (W part 1)  
      Part 72 (W part 2)  
      Part 73 (Warr part 1)  
      Part 74 (Warr part 2)  
      Part 75 (Warr part 3)  
      Part 76 (X-Y-Z)  
  2006 Public Hearing Transcripts  
    Public Hearing - 4/17/06 Santa Clarita, CA  
    Public Hearing - 4/18/06 Malibu, CA  
    Public Hearing - 4/19/06 Oxnard, CA Afternoon  
    Public Hearing - 4/19/06 Oxnard, CA Evening  
    2006 Letters – Federal Government  
      Elected Officials  
      Agencies  
      Australian Government  
    2006 Letters – State Government
      Elected Officials
      Agencies  
    2006 Letters – Local Government
      Elected Officials
      Agencies  
    2006 Letters – General Public
      Part 1 Part 1 (A-B)  
      Part 2 (C-D)  
      Part 3 (E-F)    
      Part 4 (G-H)    
      Part 5 (Harris)    
      Part 6 (Heede part 1)    
      Part 7 (Heede part 2)    
      Part 8 (Hunt)    
      Part 9 (J-K)    
      Part 10 (Klimczak part 1)    
      Part 11 (Klimczak part 2)    
      Part 12 (Klimczak part 3)    
      Part 13 (Krop part 1)    
      Part 14 (Krop part 2)    
      Part 15 (Krop part 3)    
      Part 16 (Krop part 4)    
      Part 17 (L)    
      Part 18 (M)    
      Part 19 (N)    
      Part 20 (O-P)    
      Part 21 (R)    
      Part 22 (S)    
      Part 23 (Schmidt)    
      Part 24 (Sears part 1)    
      Part 25 (Sears part 2)    
      Part 26 (Sears part 3)    
      Part 27 (Sears part 4)    
      Part 28 (Sears part 5)    
      Part 29 (Sears part 6)    
      Part 30 (Sears part 7)    
      Part 31 (Sears part 8)    
      Part 32 (Sears part 9)    
      Part 33 (Sears part 10)    
      Part 34 (Sears part 11)    
      Part 35 (T-U-V)    
      Part 36 (W-X-Y-Z)    
 

Final EIR/Volume IV - Errata

 
 

Draft EIR