Welcome to the State of California

Right Column

Environmental Planning and Management

The Division of Environmental Planning and Management was organized in 1975 to ensure the compliance of the California State Lands Commission with the provisions of the California Environmental Quality Act (CEQA), and to provide analytical staff services (policy and technical) to the members of the Commission, its Executive Officer and the line programs. More....

PROGRAM AND PROJECT UPDATES

 

STATUS OF CEQA REVIEW

Carpinteria Field Area Development (Carone Petroleum Corp.)

  NOP

Chevron 4H Platform Shell Mounds Disposition

  Draft Program EIR/EA

Chevron El Segundo Marine Terminal

  NOP

Clearwater Port Liquefied Natural Gas Deepwater Port

 

NOI/NOP

Puerto de Aguas Profundas para Gas Natural Líquido de Clearwater Port

 

NOI/NOP

Hanson Sand Mining Project

 

NOP

Shore Marine Oil Terminal Lease Project

 

Draft EIR

Recommissioning of Oil Production on Oil and Gas Lease PRC 421 (Venoco, Inc.)

  Draft EIR

Shell Martinez Marine Oil Terminal Lease

  Draft EIR

Truckhaven Competitive Geothermal Lease

  NOP

Venoco Ellwood Oil Development and Pipeline (Full Field Development) Project

  Draft EIR

COMPLETED DOCUMENTS

 

CEQA DOCUMENT

PG&E Line 406-407 Pipeline Project

 

Notice of Determination (11/09)

Coscol Petroleum Corporation Marine Terminal Deconstruction and Pipeline Abandonment

 

MND (05/09)

PG&E Pease-Marysville 60kV Reconstruction Project

 

MND (05/09)

Venoco Ellwood Marine (EMT) Lease Renewal

  Final EIR (04/09)

AT&T Asia America Gateway Project (AAG)

 

Final EIR (02/09)

AT&T Fiber Optic Cable Replacement Project, Victorville, CA

 

MND (08/08)

Giacomini Wetland Restoration Project

  Final EIS/EIR (06/07)

North Baja Pipeline Expansion Project

 

Final EIR (06/07)

BHP Billiton Cabrillo Port Liquefied Natural Gas Deepwater Port

  Final EIR (03/07)

Chevron Richmond Long Wharf Marine Terminal

 

Final EIR (03/07)

PG&E Line 57C Pipeline Reliability Project

  MND (04/06)

Monterey Accelerated Research System Cabled Observatory Project

  Final EIR/EIS (08/05 )

Disposition of Offshore Cooling Water Conduits SONGS Unit 1

  Final EIR (07/05)

ExxonMobil Seacliff Pier Complex Decommissioning Program

  ND (07/05)

Shore Terminals, LLC, Marine Oil Terminal Lease Renewal

  Final EIR (04/05)

El Paso Line 1903 Pipeline Conversion Project

  Final EIR/EA (04/05)

Cabrillo Power Plant Agua Hedionda Intake Jetty (Project Terminal)

 

DEIR (02/05)

Revised PRC 421 Pier Removal Project (Bird Island)

  Final EIR (05/04)

Santa Barbara Channel Hazards Removal Project

 

MND (07/02)

Bolsa Chica Lowlands Restoration Project

 

Final EIR (04/01)