Environmental Planning and Management

The Division of Environmental Planning and Management was organized in 1975 to ensure the compliance of the California State Lands Commission with the provisions of the California Environmental Quality Act (CEQA), and to provide analytical staff services (policy and technical) to the members of the Commission, its Executive Officer and the line programs. More....

 

NEW CEQA DOCUMENTS

 

STATUS OF CEQA REVIEW

U.S. Navy Advanced Water Treatment Facility/Utility Corridor Project (P-113)

 

EA/FONSI

Shore Marine Oil Terminal Lease Project EIR

  Final EIR (01/12)

Carpinteria Offshore Field Redevelopment Project

  NOP/NOI

San Francisco Bay and Delta Sand Mining Project

  Revised Draft EIR

PROGRAM AND PROJECT UPDATES

 

STATUS OF CEQA REVIEW

PG&E Point Buchon Ocean Bottom Seismometer Project

 

MND

PG&E Central Coastal California Seismic Imaging Project

 

NOP

Broad Beach Restoration Project (Trancas Property Owners Assoc.)

  NOP

Recommissioning of Oil Production on Oil and Gas Lease PRC 421 (Venoco, Inc.)

  Draft EIR

COMPLETED DOCUMENTS (2009-2011)

 

CEQA DOCUMENT

Plumas-Sierra Fort Sage to Herlong 120kV Interconnect Project

 

MND equivalent (09/11)

Shell Martinez Marine Terminal Lease Consideration

 

Final EIR (06/11)

Chevron El Segundo Marine Terminal Lease Renewal

  Final EIR (11/10)

PG&E Line 406-407 Pipeline Project

 

Final EIR (10/09)

Coscol Petroleum Corporation Marine Terminal Deconstruction and Pipeline Abandonment

 

MND (05/09)

PG&E Pease-Marysville 60kV Reconstruction Project

 

MND (05/09)

Venoco Ellwood Marine (EMT) Lease Renewal

  Final EIR (04/09)

AT&T Asia America Gateway Project (AAG)

 

Final EIR (02/09)

 

ARCHIVED DOCUMENTS (Pre-2009)

 

CEQA DOCUMENT

AT&T Fiber Optic Cable Replacement Project, Victorville, CA

 

MND (08/08)

Giacomini Wetland Restoration Project

  Final EIS/EIR (06/07)

North Baja Pipeline Expansion Project

 

Final EIR (06/07)

BHP Billiton Cabrillo Port Liquefied Natural Gas Deepwater Port

  Final EIR (03/07)

Chevron Richmond Long Wharf Marine Terminal

 

Final EIR (03/07)

PG&E Line 57C Pipeline Reliability Project

  MND (04/06)

Monterey Accelerated Research System Cabled Observatory Project

  Final EIR/EIS (08/05 )

Disposition of Offshore Cooling Water Conduits SONGS Unit 1

  Final EIR (07/05)

ExxonMobil Seacliff Pier Complex Decommissioning Program

  ND (07/05)

Shore Terminals, LLC, Marine Oil Terminal Lease Renewal (PRC 4769)

  Final EIR (04/05)

El Paso Line 1903 Pipeline Conversion Project

  Final EIR/EA (04/05)

Revised PRC 421 Pier Removal Project (Bird Island)

  Final EIR (05/04)

Santa Barbara Channel Hazards Removal Project

 

MND (07/02)

Bolsa Chica Lowlands Restoration Project

 

Final EIR (04/01)

 

 

 

Abbreviations Used Above

 

 

California Environmental Quality Act (CEQA) documents

 

 

EIR = Environmental Impact Report

 

 

MND = Mitigated Negative Declaration

 

 

ND = Negative Declaration

 

 

NOI = Notice of Intent to Adopt

 

 

NOP = Notice of Preparation

 

 

National Environmental Policy Act (NEPA) documents

 

 

EA = Environmental Assessment

 

 

EIS = Environmental Impact Statement

 

 

FONSI = Finding of No Significant Impact